The Indian govt has ordered the construction of and what will be the world’s largest renewable energy plant occupying up to 72,600 hectares, a size similar to that of significant cities such as Barcelona or Sin city, according to Science Alert.

It is going to be located in the Kuth region, western side of the state of Gujarat, and you will be able to produce 30,000 gigawatts of electricity thanks to the installation of solar energy panels, storage batteries and wind generators.

However, the long-term objective of the task does not stop there, but with their construction it is intended to reach generate up to 175 megawatts of electrical power within 2022 and 450 in 2030.

In addition, a desalination plant, which will have the capacity to procedure up to 100 million lt of water per day, that will provide drinking water to the more than 500,000 people who live in this area bordering Pakistan.

These proposals will be part of India’s plan to reduce your own carbon dioxide emissions approximately 50 mil tons per year. “Energy security in addition to water security are vital nowadays,” explained Narendra Modi, Of india Prime Minister, during his demonstration.